Corridors of Commerce

Fostering economic growth with transportation investments

Program history

In 2013, the initial funding for the program was from $300 million in trunk highway bonds, which MnDOT supplemented with funds from other state and federal sources. In the 2014 legislative session, the Legislature provided trunk highway funds totaling $31.5 million for FY 2014 and FY 2015. The program did not receive funding as part of the 2016-2017 transportation budget, so there was not a 2016 solicitation and project selection round. During the 2017 legislative session, additional funding was provided to the program. A total of $300 million in trunk highway bonds and $25 million in cash/year was added for Corridors of Commerce which resulted in a total of $425 M of funding available from 2017.  In the 2018 Special Legislative Session, another $400 M of bonds was added to program, but the funding required MnDOT to use the 2017 solicitation and project selection scores to award the funding.

In 2021, the legislature again provided $200 M in trunk highway bonds.  MnDOT is assuming that the $25M in cash will also continue into the future, therefore MnDOT is anticipating $250 M being available for its next project selection round.  A is found in the table below.

Corridors of Commerce funding overview

Year Trunk highway bonds Trunk highway funds Total funding Number of projects
2013 $300,000,000 $0 $300,000,000 11
2014 $0 $6,500,000 $6,500,000 4
2015 $0 $25,000,000 $25,000,000 12
2016 $0 $0 $0 0
2017 $300,000,000 $125,000,000 $425,000,000 4
2018 $400,000,000 $25,000,000 $425,000,000 3
2021 $200,000,000 $50,000,000 $250,000,000 TBD
Total $1,000,000,000 $181,500,000 $1,181,500,000 34

Project history

Funding year Route Project description Cost estimate Project category Status
2018 Hwy 23 Expand to 4-lanes from New London to Paynesville $41,000,000 IRC Capacity Development Construction Estimated to Begin Summer of 2023
2018 Hwy 23 Expand to 4-lanes from Paynesville to Richmond $53,000,000 IRC Capacity Development Under Construction
2018 Hwy 14 Expand to 4-lanes Owatonna to Dodge Center $138,000,000 Metro Capacity Development Complete
2018 Hwy 252 / I-94 Construct Phase 1 of a MnPASS lane and grade separation $119,000,000 Metro Capacity Development Construction Estimated to Begin Summer of 2027
2017 I-494 /35W Add MnPass lanes France to TH 77 and Phase 1 of a turbine interchange $204,000,000 Metro Capacity Development Construction Estimated to Begin Summer 2023
2017 I-94 Auxiliary lane St. Michael to Albertville $63,000,000 IRC Capacity Development Construction Complete
2017 Hwy 169 Freeway conversion Hwy 101 to 197th Ave. $174,000,000 IRC Capacity Development Under construction
2015 Hwy 14 and Hwy 15 Hwy 14 and Hwy 15 intersection, New Ulm, preliminary design work $1,000,000 Freight Improvement Complete
2015 I-94 St. Michael to Albertville design options for lane addition $1,000,000 IRC Capacity Development Complete
2015 Hwy 11 Greenbush to Warroad design passing lanes $1,000,000 Freight Improvement Complete
2015 Hwy 14 Owatonna to Dodge Center purchase right of way for expansion $7,000,000 IRC Capacity Development Complete
2015 Hwy 23 New London to Paynesville purchase right of way for expansion $1,000,000 IRC Capacity Development Complete
2015 Hwy 34 Detroit Lakes to Becker CR 29 mill and overlay $1,800,000 Freight Movement Preservation Complete
2015 Hwy 169 Nine Mile Creek design work for bridge replacement $2.000,000 Freight Movement Preservation Complete
2015 I-35W Minnesota River Crossing design work $6,000,000 Freight Movement Preservation Complete
2015 I-35W Northern suburbs design work for MnPASS system $1,000,000 Metro Capacity Development Complete
2015 Hwy 65 Central Avenue design work for bridge deck replacement $2,000,000 Metro Capacity Development Complete
2015 I-94 Between Minneapolis and St. Paul design work for new pavement bridges and managed lanes $2,000,000 Metro Capacity Development Complete
2015 Hwy 51 Snelling Avenue, St. Paul provide added funding for reconstruction project $1,000,000 Freight Improvement Complete
2015 Hwy 371 Expansion to four lanes from Nisswa to Jenkins $45,000,000 IRC Capacity Development Complete
2014 Hwy 14 Purchase right of way for expansion between Dodge Center and Owatonna $2,000,000 IRC Capacity Development Complete
2014 Hwy 23 Environmental work to prepare Hwy 23 for future expansion from New London to Paynesville and Paynesville to Richmond $2,000,000 IRC Capacity Development Complete
2014 Hwy 34 Center left turn lane in Detroit Lakes from Hwy 59 to County Road 141 $2,000,000 Freight Improvement Complete
2014 Hwy 2 Reconstruct segment of roadway in Deer River $2,000,000 Freight Improvement Complete
2013 Hwy 2 Passing lanes from Cass lake to Deer River $8,000,000 Freight Improvement Complete
2013 I-94 Lanes from MN 101 to MN 241 $28,000,000 IRC Capacity Development Complete
2013 Hwy 34 Passing lanes from Detroit Lakes to Nevis $8,000,000 Freight Improvement Complete
2013 Hwy 14 4-lane Hwy 218 to east of Steele County Road 43 $12,000,000 IRC Capacity Development Complete
2013 Hwy 610 Realign and extend highway from County Road 81 and Elm Creek Boulevard to I-94 $100,000,000 Metro Capacity Development Complete
2013 Hwy 14 4-lane N. Mankato to Nicollet $20,000,000 IRC Capacity Development Complete
2013 Hwy 14 Nicollet Bypass (4 lane) $15,000,000 IRC Capacity Development Complete
2013 I-694 Add a third general purpose lane in each direction between Rice Street and Lexington Avenue $35,000,000 Metro Capacity Development Complete
2013 Hwy 169 Itasca County 4-lane from 0.66 miles southwest of County Road 15 to 0.3 miles east of County Road 7 $10,000,000 Freight Improvement Complete
2013 Hwy 23 Passing lanes from Willmar to I-90  $13,000,000 Freight Improvement Complete