Digital delivery | Digital delivery resources
Pilot projects
| District | SP# | Project Short Name | Digital Delivery Goals, Comments | Program Code | Primary Work Type | Secondary Work Type | Project Description | PM | Est. Letting Date |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 3809-09 | Hwy 169 Ely to Winton Reclaim & Overlay | • Preparing a traditional full plan set with electronic files available in 1203 • Contractual delivery of certified design model and exchange data for finish surfaces • Reducing number of plan sheets (removing alignment, superelevation, and cross-sections) • Will use Trimble Connect |
Reconditioning | Pavement Resurface & Rehabilitation | Bituminous Reclamation | Resurface Hwy 169 from Hidden Valley Rd to CR 18 (Power Dam Rd) | Ellie Sin | 20-May-26 |
| 2 | 6304-15 | Badger Creek Box Culvert Replacement | • Deliver models contractually (design, water resources, & traffic) • Reduce number of plan sheets • Use Bentley Infrastructure Cloud viewer for review. |
Bridge Replacement | BRPC- Bridge Replacement or Construction | Bridge Replacement | Grading, bituminous surfacing and box culvert replacement on Hwy 92 over Badger Creek. In-house design. Minimal plan sheets. | Shawn Groven | 22-Apr-26 |
| 3 | 8001-44 | Hwy 10, 29, & 71 Wadena Construction | • Contractual digital files | Reconstruction | GRSU - Grade & Surface | Major Construction | Road reconstruction (4-lane expansion) on US 10 from 1.3 mi W of CSAH 75 to 3rd St in Wadena and from Wadena CSAH 4 to 0.4 mi E of Oink Joint Rd & road reconfiguration from 3rd St in Wadena to CSAH 4. Includes Roundabouts AT US 10 & Ottertail CSAH 92 & US 10 & Wadena CSAH 54(Harry Rich Dr). | Eric Schiller | 26-Mar-25 |
| 4 | 1403-27 | Hwy 32 over Rice River Bridge No. 14018 | • Delivery of IFC model | Bridge Replacement | BRPC- Bridge Replacement or Construction | Bridge Replacement | Bridge replacement north of Ulen in Clay County | Kevin Lachowitzer | 25-Oct-28 |
| 4 | 1406-76 | Hwy 75 Moorhead resurface | TBD | Resurfacing | Pavement Resurface & Rehabilitation | Mill & Bit Overlay | On US 75, from north of 24th Ave. S to US 10 (Main Ave.), on US 10, from Red River to E. of 10th St. in Moorhead, grading, bituminous, concrete paving, ADA improvements, & signals | Joeb Oyster | 27-Jan-27 |
| 6 | 2508-36 | Bridge box culvert replacement | • Design discipline model, non-contractual • Construction will view ORD files on Trimble device & use Mobile Inspector software to synch inspection data with AASHTOWare • [GEC contract] |
Bridge Replacement | BRPC- Bridge Replacement or Construction | Bridge Replacement | Replace Highway 56 box culvert over stream north of Kenyon | Paul Zager | 3-Dec-25 |
| 7 | 0804-119 | Hwy 14 New Ulm Roundabout | • Using 1205 "Additional Information" for 3D files for contractor and inspection • Handing out model with Item Types included |
Safety HSIP | Traffic Control Devices/Safety | Roundabout | Construct roundabout at Jct of Hwy 14 and Highland Ave in New Ulm | Mathew Thibert | 26-Jan-24 |
| 6 | 5009-36 | TH218 Bridge box culvert replacement | • Contractual discipline model, full plan set, except for alignment | Bridge Replacement | BRPC- Bridge Replacement or Construction | Bridge Replacement | Resurface Hwy 218 north of Austin from I-90 to Mower Co. Rd. 36 south of Blooming Prairie and replace 2 box culverts | TBD | 18-Nov-26 |
| 6 | 5505-32 | TH 30 Urban partial regrade | • Design discipline model & exchange data (XML) for use with AMG Milling; drainage discipline model (if software issues resolved) | Resurfacing | Pavement Resurface & Rehabilitation | Bituminous Overlay | Mill & overlay, grading, ADA, and traffic signal from US63 to 0.03 mi. east of 5th Ave NE (Stewartville) | TBD | 2-Dec-26 |
| 6 | 5512-15 | TH 247 Bridge box culvert replacement | • Contractual discipline model; full plan set except for alignment | Unidentified | BRPC- Bridge Replacement or Construction | Bridge Replacement | Replace Hwy 247 box culvert over stream west of Plainview | Hunter Vraas | 29-Jan-27 |
| 7 | 4001-58 | Hwy 13/Hwy 99 Roundabout South of Montgomery | • TBD | Safety Capacity | Roundabout | Traffic Control Devices/Safety | Construct roundabout at Hwy 13/Hwy 99 intersection of south of Montgomery; install new lighting | Barbara Schreiber | 25-Mar-26 |
| 7 | 8302-48 | Hwy 4 St. James to Sleepy Eye | • Contractor-created digital models | Reconditioning | Pavement Resurface & Rehabilitation | Mill & Bit Overlay | Resurface Hwy 4 from Armstrong Blvd. in St James to Brown Hwy 18; replace 1 bridge | Glen Coudron | 26-Jan-24 |
| 8 | 3412-76 | Hwy 71 & Hwy 23 Resurfacing Willmar | • Contractual digital files. The milling surface was provided as a contractual model but the rest of the project designed/modeled & delivered through a plan set. (All work completed via Consultant) | Resurfacing | Pavement Resurface & Rehabilitation | Concrete Overlay | Resurface SB lane of Hwy 71 from south end of Hwy 23 bypass to the Business 71 split & resurface Hwy 23 from CR 5 to start of Hwy 23 bypass. | Al Setrum | 23-Apr-25 |
| M | 1913-107 | Hwy 61 Hastings CMGC | TBD | Reconstruction | GRSU - Grade & Surface, Pavement Resurface & Rehabilitation | Major Construction - Bit, New Pavement - Conc | CMGC. Reconstruct Hwy 61/ Vermillion St from south of 36th St to 4th St in Hastings; add roundabouts; improve frontage roads, update sidewalks & pedestrian bridge (No. 19075) connections; update signals; improve accessibility (ADA) | Robert Jones | 19-Jan-28 |
| District | SP# | Project Short Name | Digital Delivery Goals, Comments | Program Code | Primary Work Type | Secondary Work Type | Project Description | PM | Award Date |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 6926-57 | Hwy 61 Intersection Safety Improvements | • View ORD files on Trimble device and use Mobile Inspector software to synch inspection data with AASHTOWare | Safety HSIP | Traffic Control Devices/Safety | Channelization | Construct intersection safety improvements and/or add left turn lanes at 5 intersections on Hwy 61 south of Two Harbors | 13-Jun-24 | |
| 1 | 6947-57 | Hwy 37 & County Hwy 5 Intersection Safety Improvements | • View ORD files on Trimble device and use Mobile Inspector software to synch inspection data with AASHTOWare | Safety HSIP | Traffic Control Devices/Safety | Turn Lanes | Reconfigure turn lanes at Hwy 37 and CR 5 near Range Regional Airport Highway 37 & County Road 5 West and East - Left Turn Lanes/ Realignment; Intersection improvements. Grading Bituminous Mill & Surfacing & Lighting | Alex Peritz | 26-Dec-23 |
| 2 | 3902-27 | TH 11 Mill & Overlay | • Used 3D AMG milling model; D2 will certify alignment; WSB will certify milling model • Provided certified electronic XML files for surfaces and horizontal alignment non-contractually, as "1205.2 - Additional Information." • ELLE |
Resurfacing | Pavement Resurface and Rehabilitation | Bituminous Overlay | Resurface Hwy 11 from Hwy 72 to east Lake of the Woods County line. Thin overlay. | Matt Upgren | 14-Apr-24 |
| 3 | 7106-87 | 169 Redefine Elk River | • Use of consultant-created 3D model during project development to produce 2D contractual deliverable • Use of Bentley Synchro Control & Field and creation of data entry forms for field information • Using 3D model to help populate inspection/material testing forms; Tim Paul used 3D hosted Bentley Cloud. • Project involved the development of (non-contractual) 3D models to be used in development of the 2D contract deliverable; the 3D models were not used during construction. |
Reconstruction | GRSU - Grade & Surface | Bridge Replacement | Reconstruct US 169 in Elk River, TH 101 to 197th Ave. Convert to freeway design. Replace Br 71002 with new BR 71020 NB over US 10 | Darren Nelson | 16-Mar-22 |
| 4 | 5618-117 | Hwy 59, 108 - Pelican Rapids Reconstruction | • Using 3D model to populate inspection/material testing forms | Bridge Improvement & Repair | GRSU - Grade & Surface | Major Construction | Complete streets reconstruction in Pelican Rapids; resurface bridge | Thomas Pace | 27-Feb-24 |
| 6 | 2508-36 | Bridge box culvert replacement | • Design discipline model, non-contractual • Construction will view ORD files on Trimble device & use Mobile Inspector software to synch inspection data with AASHTOWare • [GEC contract] |
Bridge Replacement | BRPC- Bridge Replacement or Construction | Bridge Replacement | Replace Highway 56 box culvert over stream north of Kenyon | Paul Zager | 31-Dec-25 |
| 7 | 0804-119 | Hwy 14 New Ulm Roundabout | • Using 1205 "Additional Information" for 3D files for contractor and inspection • Handing out model with Item Types included |
Safety HSIP | Traffic Control Devices/Safety | Roundabout | Construct roundabout at Jct of Hwy 14 and Highland Ave in New Ulm | Mathew Thibert | 22-Feb-24 |
| 7 | 8302-48 | Hwy 4 St. James to Sleepy Eye | • Contractor-created digital models | Reconditioning | Pavement Resurface & Rehabilitation | Mill & Bit Overlay | Resurface Hwy 4 from Armstrong Blvd. in St James to Brown Hwy 18; replace 1 bridge | Glen Coudron | 26-Jan-24 |
| 8 | 3405-94 | TH 23 South Gap; Willmar ramps at Hwy 23 & CR 5 | • Viewed ORD files on Trimble device and used Mobile Inspector software to synch inspection data with AASHTOWare • Piloted Trimble Quadri |
Reconstruction | GRSU - Grade & Surface | Major Construction | Construct on and off ramps at Hwy 23 and CR 5 in Willmar. | Al Setrum | 24-May-23 |
| M | 0208-165 | Highway 65 - Spring Lake Park, Blaine, Ham Lake and East Bethel | • 3D Model (not contractual) & E-ticketing | Resurfacing | Appurtenance, Pavement Resurface & Rehabilitation | Median Barrier, Mill & Overlay | Repair pavement and replace bridges 6817 | Micheal Kronzer | 25-Mar-24 |
| M | 6212-192 | Hwy 36 Roseville & Little Canada | • E-ticketing | Resurfacing | Pavement Resurface & Rehabilitation | Mill & Bit Overlay | Grading, Bituminous Mill & Surfacing, ADA Improvements, TMS, Signals, and Lighting | Heather Gardner | 23-May-24 |
| M | 8282-132 | I-94 Oakdale, Woodbury, Landfall, Lake Elmo, Afton, & Lakeland | • E-ticketing | Reconstruction | GRSU - Grade and Surface, Pavement Resurface & Rehabilitation | Auxiliary Lane, Concrete Overlay | Resurface road, traffic management system, drainage, signing, lighting, guardrail, noise wall, Hudson frontage Rd resurfacing, median barrier &ADA improvements on I-94 from Hwy 120 (Century Ave) in Oakdale to St. Croix River in Lakeland & Construct EB auxiliary lane on I-94 from I-94/494/694 in Oakdale to Hwy 19 (Woodbury Dr) in Woodbury | Ryan Coddington | 10-Mar-23 |