MnDOT constructed dedicated turn lanes at the intersection of Hwy 55 and Doyle Path due to the safety concerns over the number and severity of crashes at this intersection.
Summary of work
- Constructed EB Hwy 55 left turn lane
- Constructed WB Hwy 55 right turn lane
- Extended WB Hwy 55 acceleration lane
- Removed layer of pavement and repave the road
- Minor drainage modifications