Minnesota Department of Transportation

511 Travel Info

Highway 77

Bloomington, Richfield and Minneapolis

Traffic impacts

Hwy 77 Bloomington to Minneapolis project location map

Hwy 77 project location map.

Click map for larger version.

All traffic impacts are tentative and weather dependent.

Current

Lane closures

Sun, Sept. 25 through Tue, Oct. 4; 7 p.m. to 5 a.m. nightly
  • Expect alternating lane closures on NB Hwy 77 between the Minnesota River Bridge and W. Lake Nokomis Pkwy.

Ramp closures

Wed, Sept. 28 from 6 a.m. to 6 p.m.
  • The ramps from NB Hwy 77 to Killebrew Dr. and Lindau Ln. are closed
Sun, Sept. 25 through Tue, Oct. 4; 7 p.m. to 5 a.m. nightly
  • NB Hwy 77 entrance/exit ramps between the Minnesota River Bridge and W. Lake Nokomis Pkwy. are closed for up to 15 minutes at a time. Use alternate routes.
10 p.m. Sun, Sept. 25 through 11:59 p.m. Mon, Oct. 3
  • The ramp from NB Hwy 77 to EB I-494 is closed
    • Detour: WB I-494 to SB I-35W to EB I-494
Mon, Sept. 12 through 5 p.m. Fri, Oct. 14
  • The following ramps are closed:
    • WB I-494 to NB Hwy 77
      • Detour: NB I-35W, EB Hwy 62 and NB Hwy 77/Cedar Ave.
    • Killebrew Dr. and Lindau Ln. to NB Hwy 77
      • Detour: 24th Ave. S, 77th St., Longfellow Ave., E 66th St. and NB Hwy 77

Upcoming

Information about upcoming traffic impacts will be posted as details become available.

About this project

MnDOT, in partnership with Hennepin County, will resurface Hwy 77 between the Minnesota River in Bloomington and Lake Nokomis in Minneapolis. Improvements will be made to drainage, accessibility and center median barrier.

Summary of work

  • Resurface pavement and ramps
  • Add center median barrier
  • Upgrade pedestrian/bicycle accessibility at intersections
  • Improve drainage