How the projects scored in 2019

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).

Last updated December 2019

Score District Description Amount Requested Amount Awarded Year Comments
20 7 District fiber optic network, vehicle detection and pan, tilt and zoom cameras--part 1 $1,875,000 $1,875,000 2022
20 6 Highway 14 traffic management system phase 3 $980,000 $980,000 2023
20 Metro Highway 169 freeway management system $800,000 $800,000 2023
20 6 I-35 traffic management system phase 4 $1,120,000 $0 Not selected Skipped for geographic balance
20 7 District fiber optic network, vehicle detection and pan, tilt and zoom cameras--part 2 $1,875,000 $0 Not selected Skipped for geographic balance
19 1 Districtwide signal communications and pan, tilt and zoom cameras $405,000 $405,000 2021
19 3 I-94 cameras and dynamic message system $880,000 $260,000 2021
19 Metro Highway 610 freeway management system completion $700,000 $0 Not selected Skipped for geographic balance
19 Metro I-35 freeway management system $700,000 $0 Not selected Skipped for geographic balance
18 2 Dynamic message signing $500,000 $0 Not selected
18 6 Highway 14 "Beltline" traffic management system enhancements $234,000 $0 Not selected
18 Metro Fiber optic extension and cameras $480,000 $0 Not selected
18 Metro Fiber optic extension and cameras $520,000 $0 Not selected
18 Metro Internet protocol version 6 enhancements $750,000 $0 Not selected
17 6 Highway 52 South traffic management system $520,000 $0 Not selected
16 Metro Ramp meter controller upgrade $250,000 $0 Not selected
15 6 Highway 63 traffic management system phase 2 $285,000 $0 Not selected
14 6 Active warning system for icy conditions $250,000 $0 Not selected