About the project
 
	      MnDOT, in collaboration  with Roseau County and the City of Warroad, plans to reconstruct Highway 11  between County Road 5 and Highway 313/Cedar Avenue NW and Cedar Avenue NW  between Highway 11 and Lake Street.
    
Construction is scheduled to take place in 2024-2026.
      
These roadways are in need of long-term improvements to address aging  infrastructure, safety, and access issues. This project will resurface  deteriorating pavement, replace storm sewer, and incorporate landscaping along the project area.
	    
	    2024: Resurface Hwy 11 south of the bridge and Cedar Ave. Begin Hwy 11/313  roundabout.
      
2025: Construct Highway 11/313 roundabout. Begin half of the bridge construction. 
      
2026: Continue other half of the bridge construction.
	    
	    The bridge will be constructed in 2025 and 2026. The bridge will remain open  during the winter months. 
Traffic impacts
- Truck detour

Learn more
- Find more details on the FAQ page or check out the Maps page to see the new roundabouts
- Visit the Engagement page to learn the different ways to engage with the project and view content from previous meetings
- Visit the Highway 11 Corridor Study page to learn more about the 2015 corridor study conducted on approximately 60 miles of Highway 11 in Roseau County between Greenbush and Roosevelt
- Learn more about how roundabouts improve traffic flow while also increasing safety
