Hwy 210—Baxter

Crow Wing County

Future projects

Construct 2022-2023

Inglewood Dr. project

City of Baxter to improve access to Inglewood Dr. and Knollwood Dr. on Hwy 210.

  • Note: Lane closures on Hwy 210 to be in 2023.

Project summary

  • Install a signalized intersection at Inglewood Dr.
  • Remove the signalized intersection at Knollwood Dr. and replace with a right-in and right-out access
  • Resurface Foley Rd. along Hwy 210
  • Update area city sanitary sewer, watermain and storm sewer
  • Add boulevard between trail and roadway
  • Construct railroad crossing and road connections
  • Improve to/from access on Hwy 210

Construct 2025

MnDOT will resurface and improve access on both directions of Hwy 210 between Baxter Dr. and Timberwood Dr.

Project location map

Completed projects

Recent access and mobility improvements in Baxter:

  • Pedestrian walk/bike paths along Hwy 210 and Hwy 371
  • New signalized intersection/connection at Cypress Dr. and Hwy 210
  • Right in/out access at Golf Course Rd. and Hwy 210
  • Safer frontage road access at Excelsior Rd. and Hwy 371
  • Extended dual turn-lanes at Hwy 210 and Hwy 371