Current traffic impacts
- Traffic is head-to-head through the entire project area. Travel with caution.
- Detour: eastbound I-94 on-ramp closure at Highway 59 interchange. Use CR 88 through Fergus Falls.
Project details

In 2025, the Minnesota Department of Transportation will resurface the eastbound lanes on Interstate 94 from just west of County Road 11 near Rothsay to Highway 59 near Fergus Falls.
Key project elements
- Unbonded concrete overlay (resurfacing)
- Construct pier struts and pave slope at 330th Street bridge
- Upgrade RWIS site
- On ramp closure at Highway 59 near junction of CR 88