Minnesota Department of Transportation

511 Travel Info

Hwy 4

Cosmos

About this project

Hwy 4 project map with detour route

Summary of MnDOT work

  • MnDOT is resurfacing Hwy 4 from the north side of Cosmos to south of Meeker Co Rd 23.
  • The total length of the project is approximately 9 miles.

Detour

  • The detour is no longer in place
  • Be alert for crews and heavy equipment

Project updates

July 29, 2022

  • Paving is complete; seal coats and temporary striping have been applied
  • The road has reopened
  • Work will continue under traffic
  • Permanent striping will be installed in mid-September