Construction projects, plans and studies
Updated July 5, 2022
Search for a project
Browse by region

Browse by stage
Browse by highway number
Hwys 1–9
Hwy 1 — Itasca County reclamation
Pavement reclamation, culvert work, and safety improvements east of Effie from Deer Lake to east junction of Hwy 65
- Scheduled for construction in 2022
Hwys 1, 53 and 73 — Itasca and St. Louis counties
Resurface Hwy 1 from Hwy 65 to Hwy 53 and on Hwy 73 from Hwy 1 to Hwy 53 and intersection improvement at County Road 115/Ashawa Road north junction Hwy 1 in Itasca and St. Louis counties.
- Construction resumes in spring 2022
Hwy 1 and Hwy 169 — Y Store intersection study
Looking at improvements at Hwy 1/Hwy 169/CR77 intersections
- Study underway: 2021-2022
Hwy 2 — Cass Lake corridor study
Pedestrian safety and mobility improvement study to identify potential needs on Hwy 2 in Cass Lake.
- Study underway
Hwy 2 — Cass Lake multi-use trail
Construct multi-use trail along Hwy 2 in Bena.
- Scheduled for construction in 2022
Hwy 2 — Culvert replacements
Replace three box culverts along Hwy 2 between Proctor and Hwy 194.
- Scheduled for construction in 2024
Hwy 2 — Itasca
Repave 19 miles of Hwy 2 from Prairie River to two miles east of Hwy 65
- Construction underway: 2021 - spring 2022
Hwy 2 — LaPrairie
Pavement rehabilitation, pedestrian, intersection, and ADA upgrades in the City of LaPrairie
- Scheduled for construction in 2024
Hwy 2 — Proctor resurfacing
12.5 miles on Hwy 2 with lane closures
- Scheduled for construction in 2026
Hwy 2 — Saginaw
Construct a roundabout at the intersection of Hwy 2 and Hwy 194 in Saginaw
- Scheduled for construction in 2023
Hwy 3 — Empire Township to Farmington
Construct a roundabout at the intersection of Hwy 3 and County Road 66 and add a trail
- Scheduled for construction in 2022
Hwy 3 (Robert Street) — St. Paul
Repair Robert Street viaduct, George Street overpass and Union Pacific bridge
- Scheduled for construction in 2022
Hwy 3 — Rosemount to Farmington
Evaluate the Hwy 3 corridor from 160th Street in Rosemount to Second Street in Farmington in order to identify possible improvements to improve safety, on Hwy 3 for motorists, pedestrians and bicyclists.
- Study: February 2021 through July 2022
Hwy 4 — Cosmos
Resurfacing from the north side of Cosmos to south of County Road 23.
- Construction underway: May - July 2022
Hwy 4 — St. James to Sleepy Eye
Resurface 25 miles between St. James and Sleepy Eye; replace bridges; repair culverts
- Scheduled for construction in 2023
Hwy 4 — Sherburn to St. James
Resurface approximately 25 miles of Hwy 4 between Sherburn and St. James; replace and repair bridges; improve pedestrian accommodations in Sherburn and Trimont
- Scheduled for construction in 2024
Hwy 5 (Minnehaha Avenue) and Stillwater Road — St. Paul to Maplewood
Safety, maintenance and accessibility improvements are needed on Hwy 5/Minnehaha Ave. and Stillwater Rd. from North Mendota St. to Century Ave. in St. Paul and Maplewood. The project will include repaving, maintenance, sidewalk repairs, and accessibility for all.
- Scheduled for construction in 2023 - 2025
Hwy 5 (East Seventh Street) and Hwy 61 (Arcade Street) — St. Paul
Safety and accessibility improvements are needed on Hwy 5 and Hwy 61 from I-94 to Roselawn Ave. in St. Paul. The project will include repaving, sidewalk repairs, and accessibility for all.
- Scheduled for construction in 2024 - 2025
Hwy 6 — Remer
Reconstruct or resurface Hwy 6 (Main St./Hwy 200) from the east and west intersections of Hwy 6 and Hwy 200, through Remer, Cass County.
- Scheduled for construction in 2022
Hwy 7 — Intersection study
Study of the intersection of Hwy 7 and County Road 15/24th Street in Montevideo
- Study completed
Hwy 7 — Lester Prairie
Construct roundabout at the intersection of Hwy 7 and McLeod County Road 1
- Scheduled for construction in 2023
Hwy 7 — Minnetonka to Shorewood
Repaving Hwy 7 and several other improvements.
- Construction underway: July 2021 - July 2022
Hwy 7 — Safety Study
A safety study of Hwy 7 from just east of Hutchinson to County Road 9 in Lester Prairie.
- Study completed
Hwy 7 — St. Louis Park to Hollywood
Conduct a traffic safety investigation on Hwy 7 from Hwy 100 in St. Louis Park to Carver Co. Rd. 33 in Hollywood to determine if the number and severity of crashes is abnormal, determine the primary factors for the crashes, and propose short-, medium-, and long-term updates to improve the safety of the highway.
- Study underway: November 2021 - June 2022
Hwy 8 — Chisago County
Safety and Mobility Improvement study to identified potential needs on Hwy 8 between I-35 and County Road 80 in Chisago County.
- Preliminary design study underway
Hwy 8 — Wyoming and Chisago City
Study identified possible future improvements to the Hwy 8 Corridor between Greenway Avenue North and Karmel Avenue.
- Study completed; no projects have been funded or are currently planned
Hwy 9 — Barnesville to I- 94
Resurfacing, turn lanes, utility replacement, sidewalk improvements, trail, bicycle & ADA accessibility upgrades.
- Scheduled for construction in 2023
Hwy 9 — Mustinka River bridge replacement near Norcross
Replace bridge over the Mustinka River, north of Norcross
- Scheduled for construction in 2022
Hwy 9 — New London
Addition of safety improvements for people who walk and bike
- Scheduled for construction in 2022
Hwys 10–19
Hwy 10 — Anoka and Ramsey
Corridor study identified needs
- Study completed; no projects have been funded or planned
Hwy 10 — Anoka interchange and Rum River Bridge replacement
Replace Hwy 10 bridge over the Rum River, construct new interchange at Thurston Avenue, build underpass at Fairoak Avenue and extend West Main Street; Remove all Hwy 10 access in project area.
- Construction: Spring 2022 through spring 2024
Hwy 10 — Benton County
Install 10 miles of high-tension safety cable median barrier on Hwy 10 between Sauk Rapids and Royalton.
- Scheduled for construction May 2022 to June 2022
Hwy 10 — St. Cloud to Clear Lake
Corridor study to identify future safety and access needs along Hwy 10 from 15th Ave. SE/7th St. SE in St. Cloud and Hwy 24 in Clear Lake, Sherburne County.
- Study scheduled for 2022-2023
Hwy 10 and County Road 60 — Reduced conflict intersection
MnDOT will improve access and safety at the Highway 10 and County Road 60 intersection in Otter Tail County by implementing a reduced conflict intersection (RCI).
- Scheduled for construction in 2024
Hwy 10 — Detroit Lakes Frontage Road
Resurface Hwy 10 turn lanes and Morrow Avenue (frontage road)
- Scheduled for construction in June 2022
Hwy 10 and Hwy 75 — Moorhead
Reconstruct Hwy10 and Hwy 75 in downtown Moorhead
- Scheduled for construction in 2025
Hwy 10 and Hwy 75 — 11th Street Underpass
Two grade separations of Hwy 10/75 under the BNSF rail lines, paving, pedestrian accessibility improvements, utility replacements and signals.
- Planning underway
Hwy 10 and I-94 — Mississippi River crossings feasibility analysis between Brooklyn Park and Elk River
Updated previously conducted studies, re-engaged the cities and counties, and understood the need increased river crossing capacity.
- Study completed
Hwy 10 — Ramsey
Construct new interchanges on Hwy 10 at Ramsey Blvd. and Sunfish Lake Blvd. including bridges over the BNSF Railroad tracks. Build a frontage road between Ramsey Blvd. and Sunfish Lake Blvd.
- Scheduled for construction in 2023
Hwy 10 — Randall
Improve access and safety on Hwy 10 in Randall, which includes two proposed reduced conflict intersections at Morrison Co. Rd. 14 and Hwy 115.
- Scheduled for construction in 2024
Hwy 10 — Wadena
Improve six miles of Hwy 10 from two to four lanes from east of Wadena at 620th Avenue, Otter Tail County, to west of Wadena at Oink Joint Road, Wadena County.
- Scheduled for construction in 2025
Hwy 10 — west of Sauk Rapids
Replace a box bridge under Hwy 10 three miles west of Sauk Rapids between the Benton Co. Rd. 33 interchange and 66th St. NE. Project requires one-lane traffic in each direction (July - August).
- Scheduled for construction June - September 2022
Hwy 12 — Chippewa River, Cottonwood Creek and County Ditch 3 bridge replacements
Replace the bridges at Chippewa River, Cottonwood Creek and County Ditch 3.
- Scheduled for construction in 2023
Hwy 12 — Delano to Independence
Explore options to improve safety on Hwy 12 between Hennepin Co. Rd. 90 in Independence and Co. Line Rd. in Delano.
- Study underway
Hwy 12 — Howard Lake, Waverly and Montrose
Resurface the road and make pedestrian updates in each town. MnDOT will resurface rural areas between Howard Lake and Montrose in 2022.
- Resurface rural areas between Howard Lake and Montrose in 2022
- Scheduled for construction in 2024
Hwy 12 — Orono to Independence
Improve safety and reduce crashes along Hwy 12, install a center concrete barrier, and construct a roundabout
- Construction underway: Spring 2021 - September 2022
Hwy 12 — Ortonville to Hwy 59
Resurface, widen shoulders, improve blowing/drifting snow traps, and replace box culverts.
- Scheduled for completion in 2022
Hwy 12 and Hwy 40 — Willmar Wye Rail Connector & Industrial Access Project
Realign Hwy 12 and reconstruct Hwy 40 to construct a new rail line on the west side of Willmar.
- Construction underway: May 2019 through fall 2022
Hwy 13 — Montgomery
Resurface Hwy 13 through the City of Montgomery; construct at roundabout at the intersection with Le Sueur County Road 28
- Scheduled for construction in 2023
Hwy 13 — Savage to Burnsville
Reconstruct the Hwy 13 and Dakota Ave. intersection in Savage.
- Scheduled for construction in 2022-2023
Hwy 13 — Spring Lake and Cedar Lake
Resurface and reconstruct road between Hwy 19 in Cedar Lake Township to Hwy 282 in Spring Lake Township and add left turn lanes.
- Scheduled for construction in 2022
Hwy 14 — Blue Earth County Road 56 in Eagle Lake
Construct a Restricted Crossing U-Turn (also referred to as an RCUT or J-Turn) at the intersection of Hwy 14/County Road 56 in Eagle Lake
- Completed
Hwy 14 — Dodge Center to Byron
Resurface Hwy 14 from east of Hwy 56 in Dodge Center to west of County Road 5 / Second Avenue in Byron.
- Scheduled for construction in 2024
Hwy 14 — East Rochester to west of Chester
Eastbound and westbound lanes of Hwy 14 will be resurfaced from the east side of Rochester to west of Chester.
- Scheduled for construction from May 2022 to October 2022
Hwy 14 — New Ulm to Nicollet four-lane expansion
Construct a four-lane divided highway from New Ulm to Nicollet (12.5-mile segment) and bypass the city of Courtland
- Scheduled for construction in 2022 - 2023
Hwy 14 — Rochester to Byron
Evaluate 3 intersections in the Hwy 14 corridor for modifications to improve safety between Rochester and Byron.
- Scheduled for construction in 2022
Hwy 14 — Sanborn to Springfield
Resurface over 8 miles of Hwy 14 from the west side of the Sanborn Four Corners intersection to the eastern city limits of Springfield
- Scheduled for construction in 2022
Hwy 15 — Kimball
Reconstruct Hwy 15 from Willow Creek Park, south of the railroad tracks, to Hwy 55 in Kimball, Stearns County, includes pedestrian sidewalks and city utilities. Project requires detour.
- Scheduled for construction April - July 2022
Hwy 15 — Kimball, Dassel to county line
Resurfacing from Dassel to the Meeker/Stearns county line
- Scheduled for construction in 2023
Hwy 15 — Lewisville
Resurface nine miles of Hwy 15 from Martin County Road 54 to the south interchange of Hwy 15/Hwy 60
- Scheduled for construction in 2023
Hwy 15 — Madelia
Resurface the concrete for about seven miles of Hwy 15 from the north Hwy 15/Hwy 60 interchange to the Watonwan/Brown County line near Madelia
- Scheduled for construction in 2022
Hwy 15 and Hwy 60 — Madelia
Replace the pavement for about seven miles of Hwy 15/Hwy 60 from the south Hwy15/Hwy60 interchange to the north Hwy15/Hwy60 interchange near Madelia. Both the northbound and southbound lanes will be updated.
- Scheduled for construction in 2022 - 2023
Hwy 18 - North Mille Lacs Lake
Resurface and improve 13 miles of Hwy 18 from Hwy 169 east of Garrison to Hwy 47 in Malmo, Aitkin County. Project requires a detour.
- Scheduled for construction in 2024
Hwy 19 — Cannon Falls repaving
Repaving, replacement of the traffic signal at the intersection of Hwy 19 and Hwy 20 along with ADA sidewalk improvements.
- Scheduled for construction in 2022
Hwy 19 — Lonsdale to Northfield study
Conducting a study of Hwy 19 to prepare for paving projects in 2026 and 2028.
- Study scheduled for January - December 2022
Hwy 19 — Henderson
Extend the lowest point of Hwy 19 (east of Henderson) to offset impacts to the floodway when Hwy 93 is raised. This Hwy 19 work between the Minnesota River Bridge and railroad bridge will take place in 2022, in advance of Hwy 93 construction starting in 2023
- Scheduled for construction in 2022
Hwy 19 — Winthrop
Replace the box culvert under Hwy 19, just east of Winthrop, and reconstruct a short section of pavement
- Scheduled for construction in 2022
Hwy 19 and College Drive — Marshall
Reconstruction of Hwy 19/College Drive from Fourth Street to Bruce Street
- Scheduled for construction in 2025
Old Hwy 19 — Sulphur Lake bridge removal
Bridge removal
- Construction underway: October 2021 - June 2022
Hwys 20–29
Hwy 21 — Jordan
Construct a roundabout at Hwy 21 and Sawmill Road/Old Hwy 169 and build trails to connect to existing trails.
- Scheduled for construction in 2023
Hwy 22 — Dodd Road in St. Peter
Study the segment of Hwy 22 in St. Peter from Hwy 169 to Nicollet County Road 20 to identify opportunities to improve safety and traffic flow for a future project.
- Scheduled for construction in 2028
Hwy 22 — Mankato to St. Peter
Reconstruct roadway from Mankato to St. Peter; construct roundabouts at August Dr. in Mankato and CR 21 in Kasota; build a new walking and biking trail to connect Mankato and St. Peter
- Scheduled for construction in 2024-2025
Hwy 22 — Mapleton to Wells
Resurface Hwy 22 from approximately a quarter of a mile south of Mapleton to the north city limits of Wells, including the Hwy 22/Hwy 109/Faribault County Road 29 intersection
- Scheduled for construction in 2023
Hwy 22 — Glencoe
- Scheduled for construction in 2022
Hwy 22 — St. Peter to Hwy 111
Resurface 12 miles of Hwy 22 from the intersection with Nicollet County Road 20 to Hwy 111
- Scheduled for construction in 2026
Hwy 22 and Hwy 109 – Wells
Reconstruct Hwy 22 through the City of Wells, as well as Hwy 109 from west of Rose Hill Cemetery to Hwy 22; replace utilities
- Scheduled for construction in 2026
Hwy 23 — Culvert replacement
Replacements at US Steel and Gogebic Creek.
- Scheduled for construction in 2023
Hwy 23 — Deer Creek Bridge
Replace Deer Creek Bridge on Hwy 23 just south of Pleasant Valley in Carlton County
- Construction resumes in spring 2022
Hwy 23 — Foley to Milaca
Resurface and improve 12.5 miles of road from Foley to Milaca, includes underground pipes/culverts, intersection turn lanes/access. Reconstruct one mile of road in Foley, includes storm sewer, pedestrian sidewalk/multi-use trail and new roundabout. Project requires detour.
- Scheduled for construction May - October 2022
Hwy 23 — Fond du Lac
New road connection from Hwy 23 to Fourth Street in Fond du Lac
- Scheduled for construction in 2022
Hwy 23 — Gaps
Expand Hwy 23 to four lanes from New London to Paynesville (South Gap) and Paynesville to Richmond (North Gap). Project requires detour each year.
- North Gap: Construction underway: May 2022 - November 2023
- South Gap: Scheduled for construction in 2023 - 2024
Hwy 23 — Milaca
Improve and update Hwy 23 through Milaca in Mille Lacs County, includes the road surface, drainage, multi-use access and sidewalks.
- Scheduled for construction in 2026
Hwy 23 — Mission Creek highway realignment and bridge replacement
Replace old bridge and realign highway
- Scheduled for construction in 2023
Hwy 23 — Gary New Duluth resurfacing
Resurface two miles of Hwy 23 from 5th Street to Hwy 39
- Scheduled for construction in 2023
Hwy 23 and Hwy 10 — St. Cloud interchange
Reconstruct and improve the Hwy 10 and Hwy 23 interchange area in east St. Cloud, Benton County, includes the road surface, bridges, drainage structures, pedestrian and motorist access.
- Scheduled for construction in 2023 - 2024
Hwy 24 — Annandale
Construct roundabout at Hwy 24 (Park St. E) and Hemlock St. to improve school and healthcare access. Project requires a detour. City led.
- Scheduled for construction in 2023
Hwy 25 — Brainerd
Replace the Hwy 25 bridge over the Burlington Northern Santa Fe (BNSF) Railway line in Brainerd, Crow Wing County, includes multi-use trail. Project requires detour.
- Scheduled for construction in 2023
Hwy 25 — Buffalo to Monticello
Resurface Hwy 25, from near Catlin St. in Buffalo to near Wright Co. Rd. 106/85th St. south of Monticello.
- Scheduled for construction in 2026
Hwy 25 — Buffalo
Reconstruct Hwy 25 from south of First St. S to north of Settlers Pkwy. in Buffalo, Wright County, includes city utilities and pedestrian sidewalks and approaches. Project requires detour.
- Scheduled for construction in 2023
Hwy 27 — Osakis area
Reconstruct and improve Hwy 27 between I-94 in Douglas County and Hwy 71 in Todd County. The project will replace four bridges, reconstruct and widen the road and improve access. Project requires detour.
- Scheduled for construction May - November 2022
Hwy 29 — Alexandria
Planning study to identify future highway improvements that will enhance traffic performance, mobility and driver satisfaction.
- Study underway
Hwy 29 — Glenwood overpass
Construct bridge over the railroad tracks just north of Glenwood, realign the intersection of Hwy 29 and Hwy 55
- Construction underway: July 2021 - October 2021; May 2022 - October 2022
Hwys 30-39
Hwy 30 — Rushford
Hwy 30 will be reconstructed from the west side of Rushford to Hwy 43.
- Scheduled for construction in 2022
Hwy 33 – Cloquet RCUT
Construct a Restricted Crossing U-turn (RCUT) at the intersection of Hwy 33 and Gillette Road.
- Scheduled for construction in 2022
Hwy 34 — East of County Road 29 to west of Osage
Selective tree logging in right of way, resurface (reclaim), culvert replacements, and bridge replacement at Shell River
- Scheduled for construction in 2023
I-35 — Barnum overlay
Overlay on 6.2 miles of northbound I-35 near Barnum.
- Construction scheduled for 2022
I-35E — Eagan
Replace lighting between Diffley Road and Lone Oak Road
- Construction underway: September 2021 - July 2022
I-35E — Eagan
Update signals and accessibility at Cliff Road to meet current standards.
- Construction underway: September 2021 - July 2022
I-35E and Ramsey County Road J — Lino Lakes
Locally led project to construct a new interchange at I-35E and Anoka County Road J.
- Scheduled for construction in 2025
I-35E and I-94 — St. Paul
Concrete pavement repair/resurfacing between Western Avenue and Mounds Boulevard; and on I-35E between I-94 and University Avenue in St. Paul. Resurface ramps and frontage roads, bridge repair, fix drainage and repair various sidewalks and ADA improvements.
- Construction underway: Summer 2021 - fall 2022
I-35E, I-94 and Hwy 52 Lafayette Bridge — St. Paul
Provide ideas and proposals to improve safety and traffic flow in the Hwy 52/I-94/I-35E Interchange area, identify the current issues, determine potential solutions to address those issues and evaluate those solutions.
- Study: January 2022 through December 2023
I-35W — Bloomington
Resurface I-35W with additional lanes added between 98th St. and 106th St. Five intersections will receive improved ramps, sidewalks and signals.
- Scheduled for construction in 2023
I-35W — Minneapolis
Crews will build six stormwater storage tanks east of northbound I-35W between 40th St. and 42nd St.
- Construction underway: February 2020 - June 2023
I-35W — North Gateway Study
Study the freeway between Park Avenue in Minneapolis and County Road C in Roseville to identify needs for future construction projects.
- Study underway
I-35 — Hinckley Bridge Replacements
Replace bridges along I-35 in Pine County.
- Scheduled for construction in 2023 - 2025
Hwy 36 and County Hwy 17 — Lake Elmo Avenue Interchange
Locally led project to construct interchange at Lake Elmo Avenue (Washington County Hwy 17) and Hwy 36.
- Scheduled for construction in 2025 - 2026
Hwy 36 — Little Canada to Stillwater
A 12-mile stretch of Hwy 36 between Edgerton Street in Ramsey County and Greeley Street in Washington County will undergo a road resurfacing and improvement project.
- Construction: Spring through fall 2022
Hwy 36 — North St. Paul to Oakdale study
Develop preliminary concept designs for intersection improvements at Century Avenue and Hadley Avenue
- Study completed
Hwy 36 — Roseville and Little Canada
A nearly six-mile stretch of Hwy 36 between I-35W in Roseville and Edgerton Street in Little Canada will be resurfaced. Work includes building an auxiliary lane from southbound I-3W to eastbound Hwy 36.
- Scheduled for construction in 2024
Hwy 36 — Stillwater to Minneapolis
The Hwy 36 Transit Feasibility Study will analyze existing and emerging needs for east-west transit service on Hwy 36. The study is led by Washington County.
- Study underway
Hwy 36 and County Hwy 15 — Manning Avenue Interchange
Locally led project to construct interchange at Manning Avenue (Washington County Hwy 15) and Hwy 36.
- Construction underway: 2021 - 2022
Hwy 36 and Fairview Avenue — Roseville
Rebuild and realign the ramps at westbound Hwy 36 and Fairview Avenue in Roseville. Add ADA-compliant sidewalks.
- Scheduled for construction in 2023
Hwy 36 and Hamline Avenue — Roseville
Install new, upgraded signal system at the intersection of Hwy 36 and Hamline Avenue. Update sidewalks and crossings to meet ADA requirements.
- Construction: September through November 2022
Hwy 37/County Highway 5 — Intersection Safety Improvements
Alignment changes to side highways at both intersections. New left turn lanes along Highway 37 at both intersections.
- Scheduled for construction in 2024
Hwy 37 — Iron Junction
Construct a roundabout at the intersection of Hwy 37 and Hwy 7 south of Iron Junction
- Scheduled for construction in 2022
Hwy 38 — Bigfork
Resurface Hwy 38 through Bigfork, from Rajala Mill Road to County Road 14; curb, gutter and sidewalk work
- Scheduled for construction in 2023
Hwys 40-59
Hwy 41 — Chaska to Chanhassen
Resurface Hwy 41 and make additional improvements along the highway between Pioneer Trail and Hwy 5.
- Scheduled for construction in 2023
Hwy 41 — River crossing
Connect Hwy 169 and new Hwy 212 near Hwy 41
- Study completed; no projects have been funded or planned
Hwy 43 — Repaving
Repave Hwy 43 from Hwy 44 near Mabel to Hwy 16 near Rushford in Fillmore County
- Scheduled for construction in 2022
Hwy 43 — Winona
Reconstruction of .5 mile of Hwy 43 (Mankato Ave.) from Sarnia St. to south of Hwy 61. Improvements are planned for key intersections along Hwy 43: Sarnia St., Frontenac Dr., Riverbend Rd., Bruski Dr. and Hwy 61/Hwy 14.
- Scheduled for construction in 2022
Hwy 47 — Hwy 65 (Central Avenue) to 27th Avenue
Resurface Hwy 47 from Hwy 65 to 27th Avenue NE in Minneapolis, ADA improvements, sidewalk improvements, replace guardrail and repair drainage
- Scheduled for construction in 2024
Hwy 47 — St. Francis
MnDOT is beginning a planning study of the Hwy 47 St. Francis corridor to examine a range of alternatives to address pedestrian, bicycle and motorist safety, as well as road capacity, and access and mobility issues.
- Study underway
Hwy 47/Ferry Street and BNSF Railroad Crossing — Anoka
Construct a new crossing of the BNSF Railroad north of Hwy 10
- Study completed; preliminary design underway; no projects have been funded or planned
Hwy 47 and Hwy 65 — Columbia Heights to Coon Rapids
Conducted a roadway safety audit to analyze crash information with a focus on pedestrian crashes on Hwy 47 and Hwy 65 between the Hennepin-Anoka County line in Columbia Heights and Hwy 10 in Coon Rapids. Several improvements are being made to the project area.
- Construction underway: 2020 - 2025
Hwy 47 and Hwy 65 — Northeast Minneapolis to Blaine and Spring Lake Park
This Planning and Environmental Linkage (PEL) study will create a shared community vision for the improvements that are needed most. Public input and technical data will be used to create and evaluate potential future alternatives that will serve all users.
- Study dates: Spring 2020 through summer 2023
Hwy 51 (Snelling Avenue) — Roseville to Arden Hills
Install cable median barrier between County Road C and 1-694 and extend left turn lanes at Lydia Avenue W County Road C2 and County Road C.
- Scheduled for construction in 2022
Hwy 52 Lafayette Bridge, I-94 and I-35E — St. Paul
Provide ideas and proposals to improve safety and traffic flow in the Hwy 52/I-94/I-35E Interchange area, identify the current issues, determine potential solutions to address those issues and evaluate those solutions.
- Study: January 2022 through December 2023
Hwy 52 — Hader to Zumbrota corridor study
MnDOT and Goodhue County are analyzing and evaluating the Hwy 52 corridor between Zumbrota and Hader.
- Study: January 2022 through December 2023
Hwy 52 — Zumbrota to Cannon Falls
The project follows along Hwy 52, from roughly 2 miles south of Cannon Falls and ends at Zumbrota.
- Construction underway: 2021 - 2023
Hwy 52 — Rosemount to Hampton
Resurface Hwy 52 between Co. Rd. 42 in Rosemount and Co. Rd. 86 in Hampton. Work will include constructing crossovers, repairing drainage and installing signs.
- Scheduled for construction in 2022 - 2024
Hwy 52 — St. Paul to Rochester corridor projects
Four different road construction projects are planned for Hwy 52 between Rochester and St. Paul
- Construction underway: 2020 - 2024
Hwy 53 — Eveleth Intersection Improvements
Intersection improvements on Hwy 53 from Hat Trick Avenue to Bourgin Road
- Scheduled for construction in 2025
Hwy 53 — International Falls
Reconstruct Hwy 53 from Crescent Drive to Fourth Street and on Hwy 11 from the east junction of Hwy 71 to the east junction of Hwy 53 in International Falls in St. Louis County; complete streets improvements
- Construction underway: July 2020 - October 2020; May 2021 - October 2021; and May 2022 - July 2022
Hwy 53 — Intersection improvements
Adding a southbound median left turn lane on Hwy 53 at P&H Road, widening the median crossover, and paving a portion of P&H Road.
- Scheduled for construction in 2022
Hwy 55 — Hastings to Inver Grove Heights
The Hwy 55 Safety Audit was part of a multi-agency effort to improve safety along Hwy 55 between Hastings and Inver Grove Heights in Dakota County
- Study completed
Hwy 55 — Plymouth to Golden Valley
Resurface Hwy 55 between Old Rockford Road in Plymouth and General Mills Boulevard in Golden Valley.
- Scheduled for construction in 2024 - 2025
Hwy 55 — Minneapolis to Inver Grove Heights
Update and repair pavement, add trail and redeck or repair bridges in the project area.
- Scheduled for construction in 2022
Hwy 55/Hiawatha Ave — Minneapolis
Crews will resurface Hwy 55/Hiawatha Ave. between I-35W and Hwy 62, repair bridges from Hwy 55 to 7th St., 8th St. to Hwy 55 and SB Hwy 55 over Franklin Ave.
- Scheduled for construction in 2022
Hwy 55/Olson Memorial Hwy — Minneapolis
Install new temporary pedestrian safety features at various locations along Olson Memorial Hwy (Hwy 55) between N. 7th Ave. and Thomas Ave. N.
- Scheduled for construction in 2022
Hwy 55 — Minneapolis
Remove/replace pavement on Hwy 55 between Van White Memorial Blvd. and North Bryant Ave. in Minneapolis. Project work also includes removal of the Bassett Creek tunnel and bridge repairs.
- Scheduled for construction in 2022 and 2023
Hwy 55 — Rosemount
Construct dedicated turn lanes at the intersection of Hwy 55 and Doyle Path in Rosemount
- Scheduled for construction in 2022
Hwy 55 and Hwy 59 — Elbow Lake to Barrett
Resurface, widen shoulders, replace culverts, turn lanes and access improvements, accessibility improvements in Barrett.
- Scheduled for construction in 2022
Hwy 56 — LeRoy
Reconstruction of roadway, base, pedestrian facilities, drainage and city utilities.
- Scheduled for construction in 2024
Hwy 58 & County Road 9 — Goodhue
Construction of a roundabout at Hwy 58 and Goodhue Co. Rd. 9
- Scheduled for construction in 2024
Hwy 59 and Hwy 108 — Pelican Rapids
Downtown Complete Streets reconstruction, resurface, utility replacement, bicycle and pedestrian accessibility improvements.
- Scheduled for construction in 2024
Hwys 60-79
Hwy 60 — Lake Crystal
Reconstruct Hwy 60 from west of the south junction with Blue Earth County Road 20 to east of Lakeview Road; replace utilities; construct a pedestrian train along the south side of Hwy 60 from Cemetery Road to Lakeview Road
- Scheduled for construction in 2025
Hwy 60 — Windom Corridor Study
Hwy 60 through the City of Windom is being studied to create a long-term vision for the corridor that incorporates community values, economic development, safety, and bicyclists and pedestrians
- Study completed
Hwy 60 — Bridge improvements
The bridge will be painted and expansion joints will be replaced.
- Construction underway: 2021 - 2022
Hwy 61 — Active warning system
Installation of an active warning system for Hwy 61.
- Construction underway: 2021 - 2022
Hwy 61 — Intersection improvements
Safety improvements at five intersections along Hwy 61 up the North Shore
- Scheduled for construction in 2024
Hwy 61/Arcade Street and Hwy 5/East 7th Street — St. Paul
Safety and accessibility improvements are needed on Hwy 5 and Hwy 61 from I-94 to Roselawn Ave. in St. Paul. The project will include repaving, sidewalk repairs, and accessibility for all.
- Scheduled for construction in 2024 - 2025
Hwy 61 — Hastings
Recommend alternatives to improve safety and mobility on Hwy 61 between 4th Street and 36th Street in Hastings.
- Study: Spring 2022 through spring 2023
Hwy 61 Wabasha to Minnesota City
Resurfacing southbound lanes, constructing a reduced conflict intersection at Hwy 42 and replacing approach panels on six bridges
- Scheduled for construction in 2022
Hwy 61 Resurfacing - Lake City to Red Wing
Resurfacing road, adding passing zone and changing access
- Scheduled for construction in 2023
Hwy 61 — Two Harbors corridor
- Hwy 61 from County Road 61 to Park Road
- Scheduled for construction in 2025-2026
Hwy 61 — Withers Harbor Bridge
- Scheduled for construction in 2023
Hwy 61/Hwy 316 roundabout
Constructing a roundabout at intersection, improving bicycle facilities, connections near Prairie Island Indian Community
- Scheduled for construction in 2022
Hwy 61 bridge replacement – Red Wing
Replacement of Hwy 61 bridge over CP Rail in Red Wing, onstruction of new left and right turn lanes at Golf Links Drive intersection and at private accesses
- Scheduled for construction in 2024
Hwy 61/County Road 18 intersection safety
Constructing a reduced conflict intersection north of Red Wing
- Scheduled for construction in 2022
Hwy 61 – Red Wing corridor projects
Five different construction projects are planned for Hwy 61 near Red Wing
- Scheduled for construction 2022-2024
Hwy 61 — Lake County
Install new efficient tunnel lighting systems
- Scheduled for construction in 2024
Hwy 61 — Silver Creek and Stewart River bridges
Replace Silver Creek Bridge, rehabilitate existing Stewart River Bridge and add new bridge inland.
- Scheduled for construction in 2021 - 2023
Hwy 61 — London Road project
Repave London Road from 26th Avenue East to 60th Avenue East; intersection improvements
- Scheduled for construction in 2025
Hwy 65 — Mora
Reconstruct the Hwy 65 (Hwy 23) bridge over the Snake River south of Division Street in Mora, Kanabec County, includes new multi-use trail. Expect reduced speeds and narrow lanes with no shoulders through work zone.
- Scheduled for construction May - November 2022
Hwy 65 — Resurfacing project
Repave 42.59 miles of alternating sections of Highway 65 from the north junction of Highway 1 to 0.5 mile south of Highway 8 in Itasca County and Koochiching County.
- Scheduled for construction in 2022
Hwy 65 — Ham Lake to East Bethel
Several crashes occurred at this RCI intersection in spring and summer 2020, and some are still under review by the State Patrol. In the meantime, MnDOT engineers are reviewing all available historical crash data to identify patterns, and will be taking short term steps to enhance safety of the intersection. MnDOT continues to work closely with the City of East Bethel and Anoka County to understand the community's needs and concerns.
- Project completed in August 2019.
Hwy 65 — Spring Lake Park to East Bethel
Resurface nearly 16 miles of Hwy 65 between County Road 10 in Spring Lake Park and 217th Avenue in East Bethel. Work will include bridge replacement, reconstruction of settled pavement, installation of cable median guardrail, drainage improvements and curb ramp and sidewalk improvements at several intersections.
- Scheduled for construction in 2024
Hwy 65/Third Avenue Bridge — Minneapolis
The Hwy 65/Third Avenue bridge will get major renovation improvements including a new bridge deck.
- Construction underway: May 2020 - August 2022
Hwy 65 — Albert Lea Main Street
Repaving road, flood mitigation and ADA work
- Scheduled for construction in 2022
Hwy 67 — Clarkfield
Reconstruction of Hwy 67 from Hwy 59 to Sixth Street
- Scheduled for construction in 2024
Hwy 67 — Granite Falls to Echo
The road will remain closed through 2020 due to slide area
- Not yet scheduled for construction
Hwy 68 — Minneota to Marshall
Shoulder widening and culvert replacement
- Scheduled for construction in 2022
Hwy 71 and Hwy 29 — Wadena
Resurface or reconstruct segments of road, upgrade signal systems, improve pedestrian sidewalks and ramps in Wadena, Wadena County. Includes underground city utilities and storm sewer on Hwy 71 from Birch Ave. N to Elm Ave. N. Project requires detour.
- Scheduled for construction in 2025
Hwy 71 — Browerville
Replace Hwy 71 bridges over the Drayer Creek and Harris Creek in Browerville, Todd County. Project requires detour.
- Scheduled for construction June - August 2022
Hwy 71 — Olivia
Resurfacing of Hwy 71 from Viking Drive to the intersection of Hwy 212 in Olivia
- Scheduled for construction in 2022
Hwy 71 — Sauk Centre
Reconstruct and improve safety on Hwy 71 in Sauk Centre, Stearns County.
- Scheduled for construction in 2027
Hwy 73 — Chisholm
Resurface Hwy 73 from Hwy 169 to 13th Street NW/McNiven Road
- Scheduled for construction in 2028
Hwy 73 — St. Louis County bridge and culvert replacement
Replace a culvert half a mile south of Beauty Mountain Road and replace a bridge at County Road 16 in St. Louis County
- Scheduled for construction in 2023
Hwy 75 — Graceville to Dumont
Resurface from north of Highway 28 near Graceville to CR 11 near Dumont
- Scheduled for construction in 2022
Hwy 75 — Hallock
Resurface Hwy 75 and make pedestrian accommodations.
- Scheduled for construction in 2022 - 2023
Hwy 75 — Rabbit River bridge replacement
Replace the bridge at Rabbit River, south of Doran
- Scheduled for construction in 2023
Hwy 75 and Hwy 40 — Madison
Resurfacing and ADA improvements on Hwy 75 and Hwy 40 in Madison
- Scheduled for construction in 2023
Hwy 76 bridge repairs — Money Creek
Repairing three bridges over Money Creek, north of Houston.
- Scheduled for construction in 2022
Hwy 77/Cedar Avenue — Apple Valley to Richfield
Evaluate the Hwy 77/Cedar Avenue corridor from 138th St. in Apple Valley to I-494 in Richfield.
- Study underway
Hwy 77 — Apple Valley
Replace lighting at McAndrews Road and 127th Street
- Construction: July through September 2022
Hwy 77 — Bloomington to Minneapolis
Hwy 77 will be resurfaced, improve drainage, improve accessibility and center media barrier added.
- Scheduled for construction in 2022
Hwy 77 — Richfield
Build underpass beneath Hwy 77 connecting 77th Street in Richfield to 66th Street; build ramps, build trail, sidewalk.
- Construction underway: 2021 - 2022
Hwys 80-99
Hwy 86 — Lakefield
Reconstruct Hwy 86 through the City of Lakefield; upgrade wastewater and water systems
- Scheduled for construction in 2022
Hwy 87 — Frazee Complete Streets
Downtown Complete Streets reconstruction, resurface, utility replacement, ADA improvements and multi-use trail.
- Scheduled for construction in 2022
I-90 — Alden to Albert Lea westbound resurfacing
Resurfacing of westbound lanes, construction of traffic crossovers and new guardrail installation on eastbound and westbound lanes.
- Scheduled for construction in 2024 - 2025
I-90 — Austin bridge reconstruction
Replacing and repairing six bridges.
- Scheduled for construction from 2023-2025
I-90 eastbound — High Forest resurfacing
Resurfacing approximately 8.6 miles of I-90 eastbound from 2.5 miles east of Mower Co. Rd. 1 to .9 miles east of Hwy 63 in Olmsted County
- Scheduled for construction in 2022
I-90/Hwy 52 — Interchange reconstruction
Construction will occur at the I-90/Hwy 52 interchange, southeast of Rochester.
- Scheduled for construction in 2024 - 2025
I-90 — Sherburn to Fairmont
Resurface fifteen miles of eastbound I-90 between Sherburn and Fairmont
- Scheduled for construction in 2022
I-90 — South Dakota to Beaver Creek
Four miles of I-90 from the South Dakota border to Beaver Creek will be resurfaced
- Scheduled for construction in 2022
Hwy 93 — Henderson
Raise Hwy 93 from the intersection of Hwy 169 to the southern limits of Henderson, putting it above the 100-year flood elevation
- Scheduled for construction in 2023 - 2024
I-94 — Alexandria
Interchange planning study to develop various concepts to apply for funding and to have approved concepts ready to submit to FHWA for approval.
- Study underway
I-94 — East Metro Interchange study (I-694/I-494/I-94)
This study focuses on finding the long-term vision for the I-94/I-494/I-694 interchange while ensuring that other projects in the interchange area are compatible with that vision.
- Study underway
I-94 Gap — Albertville to Monticello
Expand I-94 to three lanes in each direction between Albertville and Monticello, Wright County; includes underground pipes, ditch drainage and bridges.
- Scheduled for construction in 2024
I-94, I-35E and Hwy 52 Lafayette Bridge — St. Paul
Provide ideas and proposals to improve safety and traffic flow in the Hwy 52/I-94/I-35E Interchange area, identify the current issues, determine potential solutions to address those issues and evaluate those solutions.
- Study: January 2022 through December 2023
I-94 — Maple Grove to Clearwater
Resurface road, replace/construct bridges, add lanes and improve access. Expect lane closures and roadwork in St. Michael and Monticello to Hasty, Wright County.
- Scheduled for completion in August 2022
I-94 and I-394 — Minneapolis
Repair bridge joints and resurface ramps connecting I-94 and I-394 to downtown Minneapolis.
- Construction underway: April 2021 - spring 2022
I-94 and Hwy 10 — Mississippi River crossings feasibility analysis between Brooklyn Park and Elk River
Updated previously conducted studies, re-engaged the cities and counties, and understood the need increased river crossing capacity.
- Study completed
I-94 — Oakdale to Lakeland
Resurface I-94 between Hwy 120/Century Ave. and the St. Croix River. Additional work includes constructing a new eastbound lane from I-494 to Woodbury Dr., repair drainage, replace signage, upgrade lighting, install median barrier and more improvements along the project area.
- Scheduled for construction in 2022 - 2024
I-94 — Rethinking Minneapolis to St. Paul
MnDOT, along with FHWA, Ramsey & Hennepin Counties and the cities of St. Paul and Minneapolis, are preparing a Tiered Environmental Impact Statement for the Rethinking I-94 effort. Rethinking I-94 intends to reconnect neighborhoods, revitalize communities and ensure residents have a meaningful voice in transportation decisions that affect their lives.
- Environmental review underway
I-94 — St. Cloud
Resurface and make repairs to the I-94 bridges over the retired rail line west of the Hwy 23 interchange in southwest St. Cloud. Plan for one lane, each way through work zone.
- Construction is scheduled for mid-August 2022 to late October 2022
I-94 — St. Paul
Construct or repair a noise wall and install landscaping between Prior Avenue and Fairview Avenue
- Construction completed
I-94 — St. Paul
Install landscaping from Pascal Street to Mackubin Street
- Construction: May through October 2023
I-94 — St. Paul standalone noise barrier
Constructed a new wood plank and concrete post noise barrier on eastbound I-94 between Fairview Avenue and Prior Avenue in St. Paul.
- Construction completed
I-94 and I-35E — St. Paul
Concrete pavement repair/resurfacing between Western Avenue and Mounds Boulevard; and on I-35E between I-94 and University Avenue in St. Paul. Resurface ramps and frontage roads, bridge repair, fix drainage and repair various sidewalks and ADA improvements
- Construction underway: 2021 - 2022
I-94 parallel streets — St. Paul
ADA improvements and sidewalk and driveway repairs on streets along and parallel to I-94 and I-35E.
- Construction: April through September 2022
I-94 — Central Minnesota
Future road construction plans for I-94 in Wright and Stearns counties, in central Minnesota. Includes the communities of St. Michael, Albertville, Monticello, Clearwater, St. Cloud, Collegeville and Sauk Centre.
I-94 and Hwy 27 — Eastbound ramps
Hwy 27/Eastbound Interstate 94 intersection improvements.
- Scheduled for construction in 2023
Hwy 95 — Cambridge
Reconstruct or expand segments of Hwy 95 between Fern St. and Fillmore St. in Cambridge, Isanti County; includes underground city utilities, accesses and sidewalks.
- Scheduled for construction in 2026
Hwy 97 — Forest Lake
Safety improvements, construct dedicated turn lanes on Hwy 97, and construct a multi-use trail.
- Scheduled for construction in 2024 - 2025
Hwys 100-199
Hwy 104 — Glenwood to Hwy 9
Resurface Hwy 104 from Glenwood to junction of Hwy 9 near Sunburg.
- Scheduled for construction in 2025
Hwy 105 — Iowa Border to Austin
Hwy 105 will be resurfaced from the Iowa border to Turtle Creek in Austin.
- Scheduled for construction from August 2022 to October 2022
Hwy 108 — Henning
Reconstruct Hwy 108 in Henning, utility replacements, bicycle and pedestrian accessibility upgrades.
- Scheduled for construction in 2024
Hwy 108 — I-94 to Pelican Rapids
Resurface from Interstate 94 and Ninth Street in Pelican Rapids
- Scheduled for construction in 2022
Hwy 114 — Lowry to Hwy 28
Reconstruction, resurfacing, sewer replacement, sidewalk improvements, trail, bicycle & ADA accessibility upgrades.
- Scheduled for construction in 2024
Hwy 120 — Maplewood to Oakdale
This study will identify issues, priorities and environmental concerns on Hwy 120 between I-94 in Maplewood and I-694 in Oakdale.
- Study underway
Hwy 123 — Sandstone
Resurfacing Hwy 123 from Hwy 23 to County Hwy 30, and realign Hwy 123 and Hwy 23 intersection
- Scheduled for construction in 2021 - 2022
Hwy 135 — Biwabik
Reconstruct Hwy 135 in Biwabik; complete streets improvements
- Construction underway: 2020 - 2022
Hwy 156/Concord Street — St. Paul
Repair and resurface nearly one mile of Hwy 156 between Hwy 52 and Annapolis Street in St. Paul. Work includes new traffic signals at Concord St., ADA improvements and retaining wall repair.
- Construction underway: August 2021 - July 2022
Hwy 169 — Belle Plaine to Blakeley Township
Improve or eliminate certain intersections and install a cable median barrier to improve the safety of the corridor on Hwy 169 between Hwy 25 in Belle Plaine and Hwy 19 in Blakeley Township.
- Scheduled for construction in 2023
Hwy 169 — Cross Range corridor study
Study of Highway 169 between Taconite to Pengilly to evaluate the existing corridor, conduct traffic analysis and provide alternative screenings.
- Study: 2022-2023
Hwy 169 — Garrison
Improve five miles of Hwy 169 from south of Garrison at Crow Wing County Road 26 to north of Garrison at Pike Avenue; includes new storm sewer, sidewalk and improve access at the busy intersection of Hwys 18 and 169 in Garrison.
- Scheduled for construction in 2025
Hwy 169 — Osseo to Champlin
Install 5.5 miles of high-tension cable median barrier and update median guardrail ends between County Road 81 in Osseo and West River Road/Dean Avenue East in Champlin.
- Construction: June through July 2023
Hwy 169 — Shakopee to Blakely
Identify options for access changes, improvements to safety and mobility
- Study underway
Hwy 169 and Hwy 41 — River Crossing
Connect Hwy 169 and new Hwy 212 near Hwy 41
- Study completed in 2015; no projects have been funded or planned
Hwy 169 — Blue Earth to Elmore
Resurface nine miles of Hwy 169 from Faribault County Road 52 (southern limits of Blue Earth) to the northern limits of Elmore
- Scheduled for construction in 2022
Hwy 169 — Elk River freeway
Convert three miles of Hwy 169 to a new freeway system through Elk River from Hwy 101/Hwy 10 to 197th Ave, Sherburne County. Corridors of Commerce project. Expect delays, one lane traffic in each direction, 24/7, April to November, each year.
- Scheduled for construction in 2022 - 2024
Hwy 169 — Mankato/North Mankato Corridor Study
A nine-mile corridor of Highway 169 through Mankato/North Mankato is being studied for safety, intersection modifications, traffic flow, pedestrian and bicyclist connections, and alternative roadway designs to develop a long-term vision for future improvements
- Study completed
Hwy 169 — Broadway to Union in St. Peter
Reconstruct Hwy 169 from Broadway Avenue to Union Street in St. Peter
- Scheduled for construction in 2026
Hwy 169 and Hwy 200 — Hill City roundabout
Construct a roundabout at the intersection of Hwy 200 and Hwy 169 in Hill City.
- Scheduled for construction in 2025
Hwy 169/210 — Aitkin to north of Hassman
Reconstruct 11 miles of road surface, widen shoulders and upgrade drainage infrastructure. Project requires detour.
- Scheduled for construction in 2023 - 2025
Hwy 169/Hwy 22/Hwy 99 — St. Peter intersections
To improve safety and traffic flow on the south side of St. Peter, construct dual left turn lanes at the intersection of Hwy 169/Hwy 22 and construct a Restricted Crossing U-Turn (also referred to as an RCUT or J-Turn) at the intersection of Hwy 169/Hwy 99
- Scheduled for construction in 2023
Hwy 194 — RCUT and roundabout
- Scheduled for construction in 2022
Hwy 194 — Central Entrance
Reconstruct Hwy 194/Central Entrance in Duluth from Trinity Road to Mesaba Avenue.
- Scheduled for construction in 2026-2027
Hwys 200-299
Hwy 200 — Mahnomen to Roy Lake
Resurface, widen shoulders, improve pedestrian accessibility, and drainage repairs.
- Scheduled for construction in 2022
Hwy 210 — Box Culvert Replacements
Replace four box culverts along Hwy 210 in Carlton County.
- Scheduled for construction in 2022
Hwy 210 — Brainerd
Improve the four-lane segment of Hwy 210/Washington St. from Baxter Dr. to Pine Shores Rd. in Brainerd, Crow Wing County; includes upgrades to the Mississippi River bridge and sidewalks.
- Scheduled for construction in 2026 - 2027
Hwy 210 — Baxter
Improved five miles of Hwy 210 through Baxter between Baxter Dr. and Timberwood Dr., Crow Wing County.
- Scheduled for City of Baxter Inglewood Dr. construction in 2022 - 2023
- Scheduled for MnDOT construction in 2025 - 2026
Hwy 210/61 – Carlton RCI
Carlton County is constructing a reduced conflict intersection to accommodate the new Carlton County Justice Center.
- Scheduled for construction in 2024
Hwy 210 and Hwy 73 — Cromwell
Drainage and safety improvements
- Scheduled for construction in 2021 - 2022
Hwy 210/I-94 west junction
Bridge replacement, ramp reconstruction/realignment, bicycle and pedestrian accommodations
- Design study underway; scheduled for construction in 2028
Hwy 212 — Carver to Norwood Young America
MnDOT is partnering with Carver County to do preliminary design for 4-lane expansion and environmental documentation.
- Preliminary design: Through 2023; Scheduled for construction in 2024 - 2025
Hwy 212 — Carver to Cologne
A 4-lane expansion from County State Aid Hwy 11 (where existing 4-lane ends) in Carver to County Road 36 in Cologne. Project work includes upgrading pavement, increasing the travel lanes from two to four, realigning Hwy 212 in Dahlgren Township, creating safer routes to get on/off and across Hwy 212 and creating safer access to local properties.
- Construction underway: May 2021 - October 2022
Hwy 212 — Brownton
Construct roundabout at the intersection of Hwy 212 and Hwy 15 near Brownton
- Scheduled for construction in 2025
Hwy 212 — Glencoe
Construct two J-turns on Hwy 212 in the Glencoe area.
- Construction underway: May - July 202
ADA improvement project
Improvements to sidewalks, ramps and driveways to meet current ADA standards on multiple highways
Construction underway: April 2021 - summer 2022
Hwy 212 and Morningside Drive — Glencoe
Construct roundabout at the intersection of Hwy 212 and Morningside Dr. in Glencoe
- Scheduled for construction in 2024
Hwy 212 — Sacred Heart
Resurface Hwy 212 with reconstruction in Sacred Heart
- Scheduled for construction in 2023
Hwy 218 — Blooming Prairie
The Hwy 218 corridor through Blooming Prairie (Fourth Street to Hwy 30) is due for reconstruction in 2024.
- Scheduled for construction in 2024
Hwy 243 — Franconia Township and Osceola
Designing the reconstruction of the Hwy 243/Osceola Bridge over the St. Croix National and Scenic Riverway, in partnership with the Wisconsin Department of Transportation (WisDOT).
- Scheduled for construction in 2026
Hwy 252 and I-94 — Environmental Review
MnDOT, along with FHWA, Hennepin County and the cities of Brooklyn Center, Brooklyn Park and Minneapolis, are preparing an Environmental Impact Statement (EIS) for the Hwy 252/I-94 project. The project partners will address the purpose and need for the project in the EIS document and develop transportation alternatives.
- Environmental review underway
Hwy 263 — I-90 to Ceylon
Resurface Hwy 263 in preparation for a turnback of the highway to Martin County
- Scheduled for construction in 2022
Hwys 300-694
Hwy 316 — Hastings
Reconstruct Hwy 316 between the north junction of Hwy 61 and Michael Avenue
- Construction underway: May 2021 - summer 2022
Business Hwy 371 — Barrows to Brainerd
Reconstruct the road, upgrade the signal and improve pedestrian access from Greenwood St. to Joseph St. in Brainerd; Resurface from 70th Ave. in Barrows to Greenwood St. Work requires detours.
- Scheduled for construction May - October 2022
Hwy 371 — East of Gull Lake, Brainerd
Install three reduced conflict intersections between Gull Lake Dam Rd. and Green Gables Rd., Crow Wing County. Includes frontage roads and access to Birchdale Rd. (Brainerd International Raceway).
- Scheduled for construction in July - November 2022
Hwy 371 — Hackensack
Reconstruct Hwy 371 from County Road 40 to County Road 5 in Hackensack.
- Community outreach, information gathering and project development
I-394 and Washington Avenue — Minneapolis
Add a left-turn lane, improve walker access and safety.
- Scheduled for construction in 2023
I-394 and I-94 — Minneapolis
Repair bridge joints and resurface ramps connecting I-94 and I-394 to downtown Minneapolis.
- Construction underway: April 2021 - spring 2022
I-494 — Airport to Hwy 169
Study to evaluate design alternatives and determine a scope of work for the future reconstruction of the I-494 corridor from the MSP Intl’ Airport to Hwy 169. The proposed project is envisioned to improve the capacity of the interstate and dramatically improve the reliability of the average rush hour trip.
- Study underway; Scheduled for construction in 2022 - 2024
I-494 — Richfield
Build tunnel under I-494 at Knox Avenue for Orange line bus rapid transit.
- Scheduled for completion in 2022
I-494/Wakota Bridge — Newport and South St. Paul
Bridge resurfacing on I-494/Wakota Bridge between Newport in Washington County and South St. Paul in Dakota County.
- Scheduled for completion in 2022
I-494 and I-35W — Study
Interchange Improvements
- Study underway; no projects have been funded or planned
I-494 — East Metro Interchange study (I-694/I-494/I-94)
This study focuses on finding the long-term vision for the I-94/I-494/I-694 interchange while ensuring that other projects in the interchange area are compatible with that vision.
- Study underway
I-494 and I-694 — Woodbury to Oakdale
Install landscaping on I-694 from 10th Street to I-694/494/94 junction and on I-494 from I-694/494/94 junction to Tamarack Road
- Construction underway: August 2021 - November 2023
I-535 – Blatnik Bridge
Replacement of the Blatnik Bridge between Duluth, Minn., and Superior, Wis.
- Scheduled for construction in 2027
I-535 – Blatnik Bridge maintenance
Maintenance project on the Blatnik Bridge between Duluth, Minn., and Superior, Wis.
- Scheduled for construction in 2022
I-694 — Non-motorized crossing study
Determine safety and mobility needs for bicyclists and pedestrians for the area
- Study completed; no projects have been funded or planned
I-694 — East Metro Interchange study (I-694/I-494/I-94)
This study focuses on finding the long-term vision for the I-94/I-494/I-694 interchange while ensuring that other projects in the interchange area are compatible with that vision.
- Study underway
I-694 and Silver Lake Road — New Brighton
Install new, upgraded signal system at the intersection of I-694 and Silver Lake Rd. Update sidewalks and crossings to meet ADA requirements.
- Construction: June through July 2022
I-694 and I-494 — Woodbury to Oakdale
Install landscaping on I-694 from 10th Street to I-694/494/94 junction and on I-494 from I-694/494/94 junction to Tamarack Road
- Construction underway: August 2021 - November 2023
ADA improvement project
Improvements to sidewalks, ramps and driveways to meet current ADA standards on multiple highways.
- Construction underway: April 2021 - spring 2022
Fifth Avenue West Bridge study — Duluth
The goal of this study is to jump start the MnDOT scoping process for a future bridge project on the Fifth Avenue West Bridge over I-35
- Study underway
Metro Wide — St. Paul, White Bear Lake, South St. Paul, Eden Prairie and Cologne
Apply a thin surface treatment on Hwy 5 from Excel Energy Center to St. Clair Ave. in St. Paul. On Hwy 61 from Keller Lake to County Road 65 in White Bear Lake. On Hwy 3/South Robert Street from Mendota Road to Annapolis Street. On Hwy 212 from I-494 to Hwy 62 and on Hwy 284 from Hwy 212 to Hwy 5 in Cologne.
- Construction underway: June 2021 - June 2024
Metro Wide — Mendota, Minneapolis, Maplewood and Woodbury
Repair concrete road surface on Hwy 62 from the west end of the Mendota Bridge to Hwy 5. On Hwy 55 from Hiawatha to I-94. On I-694 from Hwy 61 to Hwy 36 and on I-494 from Tamarack Road to Lake Road.
- Construction underway: May 2021 - June 2022
Plymouth Avenue — Minneapolis
The Plymouth Avenue bridge over I-94 in Minneapolis will get a new driving surface and the nearby intersection at Plymouth Avenue and Third Street will get improved sidewalks, ramps and signals.
- Scheduled for construction in 2023
Rumble strip installation - Multiple locations
Installation of rumble strips will start in various locations across southeast Minnesota.
- Scheduled for construction in 2022
Stone Arch Bridge — Minneapolis
Preservation of the historic bridge including repointing mortar and repairing/replacing some of the stone
- Scheduled for construction in 2022 - 2024
Thompson Hill Visitor Center — St. Louis County
Resurface entire rest area roadway and parking lots and replace all sidewalks and trails
- Completed
Urban freight perspectives study — Metro district
The Urban Freight Perspectives study focused on enhancing freight mobility in MnDOT’s Metro District by improving communication with freight stakeholders and integrating freight considerations into the district’s project development process.
- Study completed